Call Us: 1-800-829-4419   

Flow Coating Process


Can't occupy an overhead bridge crane? Don't have enough forklifts?  When the material handling of Oil Country Tubular Goods poses a problem, we have the Working Solution.Working Solutions manufactures flow coating zinc phosphate tanks capable of processing 5 to 20 connections per cycle.  Our systems utilize acid resistant static nozzles which are manually positioned to coat either the pin or the box connection of tubular products.

We offer several options which are not limited to....

  • Gas, Electric or Steam Heated
  • Insulation
  • Lids
  • Secondary Containment Units
  • Programmable 24/7 Timers
  • No Clog Spray Nozzles
  • Static Directional Hoses  
For More information on finishing and cleaning equipment, visit our sister company: